Showing posts with label Kaizen Report Week 11 March 17. Show all posts
Showing posts with label Kaizen Report Week 11 March 17. Show all posts

March 17, 2018

Kaizen Report for HGPMP Week 11 March 17, 2018

PAGSASANAY SA TAGUMPAY

1. Pics of office (storage, files)/chapel, cr. 


 CSS2 assisting customers 

 Am talk with the staff

 Inside chapel B

 Inside chapel A

 In front of the altar

 Updated ledgers

Sanitary permit and electrical permit for columbarium already processed. Building permit for checking at City Engineering Office.

 2. Pics of site (the park) beautification/construction

 Format for columbarium

Contractors checking the staka for columbarium


 3. Pics of warehouse inside and outside


 Inside the warehouse where cements are kept

 Wood and steel materials inside warehouse

 Padlock used to secure the materials at warehouse

 Door of the warehouse


 4. Pics of inventory of equipment


 Materials for cleaning lawn lots

 Trailer often used by ISG to refill and back fill land for interment which is maintained it's cleanliness daily after use.


 5. Pics of operational equipment

 Expedition and Karwahe of HGPMP

 Crosswind for Malasiqui

 URVAN for San Carlos