Showing posts with label Back filling. Show all posts
Showing posts with label Back filling. Show all posts

June 29, 2019

HGCMP Kaizen Report June 29, 2019

Kaizen Report


Pics of Office





Abstract




Filling Cabinet



Map


Pics Of Park


Rotonda


Entrance


Temporary Lot


Entrance







YJ and pic of Warehouse




Progress of Back Filling







Pics of ISG


P.E. of Staff


Volleyball





Pics of Staff

April 13, 2013

Holy Gardens Calapan, Back filling, Drainage construction and Insatlled Tarpaulin Report, April 13, 2013

Let us have ears that can hear, minds that can understand, hearts that can feel, hands that can do...Let us read and understand these posts




 They started hauling for drainage construction 



Engr. Haylo and his people while locating the drainage and road for construction 


Mang Pando while measuring the number of volume in  T/L 


Lay out of road in Seior Single Niche area by Engr. Haylo 


Pictures of delivered mix materials early in the morning







Tarpaulin in our Entrance gate 


Tarpaulin to be installed inside the memorial park, 
putting eyelets first so that it can be install properly