Showing posts with label HGPMP Kaizen Report July 15 2017. Show all posts
Showing posts with label HGPMP Kaizen Report July 15 2017. Show all posts

July 15, 2017

Holy Gardens Pangasinan Kaizen Report Week 28, July 15, 2017

PAGSASANAY SA TAGUMPAY

 1. Pics of office (storage, files)/chapel, cr
Stock room



Hanging Cabinet

Waiting Area

Male C.R

Female C.R

Lavatory

 2. Pics of site (the park) beautification/construction
On going brush cutted grasses beside office











On going construction of Body Crypt



Newly brush cutted Lawn 4B

Fabricated Regular Vault

Constructed Road from G.E to SSN

Gutter along wide road







Going to SSN wide road

 3. Pics of warehouse inside and outside; SHOW INVENTORIES AND LOCKS
Cement, 10mm Deformed Bar



Ordinary plywood, PVC Pipe

 Lock

 4. Pics of inventory of equipment (especially of those non operating) and materials

Mercedes Benz

Inventory of Regular Vault

5. Pics of operational equipment
Karuwahe

Crosswind

Expedition

L300

Landrover