Showing posts with label HOLY GARDENS OTON BACK FILLING OF MATERIALS AS OF JANUARY 2013. Show all posts
Showing posts with label HOLY GARDENS OTON BACK FILLING OF MATERIALS AS OF JANUARY 2013. Show all posts

January 30, 2013

HOLY GARDENS OTON BACK FILLING OF MATERIALS AS OF JANUARY 30, 2013

Let us have ears that can hear, minds that can understand, hearts that can feel, hands that can do...Let us read and understand these posts.

HOLY GARDENS OTON BACK FILLING OF MATERIALS
AS OF JANUARY 30, 2013


Lawn 5 Area that is still needed to be backfilled


Layered pipe in Lawn 5 area


Lawn 4  facing lawn 5

Lawn 4 facing the entrance and Lawn 3

Back Filled Materials that needs to be scrape, facing Lawn 5 area


Scraped Area in Lawn 4 facing the entrance


The box culvert in between Lawn 5 and Lawn 4