Showing posts with label Holy Gardens Pangasinan Delivered Backfiling Materials March 7-11. Show all posts
Showing posts with label Holy Gardens Pangasinan Delivered Backfiling Materials March 7-11. Show all posts

March 11, 2016

Holy Gardens Pangasinan Delivered Backfiling Materials March 7-11, 2016

BE a BIDDA: "BELIEVE, INSPIRE, DREAM, DO ACHIEVE" For kaizen reports: 1. Pics of office (storage, files) 2. Pics of site (the park) beautification/construction 3. Pics of warehouse inside and outside 4. Pics of inventory of equipment (especially of those non operating) and materials 5. Pics of operational equipment