Showing posts with label Holy Gardens Pangasinan Kaizen Report Week 12. Show all posts
Showing posts with label Holy Gardens Pangasinan Kaizen Report Week 12. Show all posts

March 18, 2016

Holy Gardens Pangasinan Kaizen Report Week 12, March 18, 2016

BE a BIDDA: "BELIEVE, INSPIRE, DREAM, DO ACHIEVE" For kaizen reports: 1. Pics of office (storage, files)/chapel 2. Pics of site (the park) beautification/construction 3. Pics of warehouse inside and outside 4. Pics of inventory of equipment (especially of those non operating) and materials 5. Pics of operational equipment

                                                                 Storage, Files
Ms. Paras & Barlaan for fixing files to be disposed to organized the things only needed

5s Files at Stockroom



Ms. Paras arranging files inside the Cabinet

Newly cleaned stockroom

Newly organized files by Ms. Barlaan & Paras



Delivered Garden Soil at HGPMP



Landscaping in front of Ash Crypt Area

Plants at Nursery





Outside the Warehouse

Inside the Warehouse including Inventory of Materials



Non Operating Equipment-TLC


On going repair of TLC

Newly repaired brushcutter

To be purchase for TLC repair - Tie Rod

Mr. Ronnie Manuel for welding of Lid Placer


Cleaning of Isuzu Crosswind

Ready for use newly cleaned Isuzu Crosswind

Cleaned L300

Inventory of Regular Vault



Inventory of Bone Vault

10mm Deformed Bar