Showing posts with label BACK FILLING OF MATERIALS IN HOLY GARDENS OTON. Show all posts
Showing posts with label BACK FILLING OF MATERIALS IN HOLY GARDENS OTON. Show all posts

March 15, 2013

BACK FILLING OF MATERIALS IN HOLY GARDENS OTON AS OF MARCH 15, 2013

Let us have ears that can hear, minds that can understand, hearts that can feel, hands that can do...Let us read and understand these posts.

BACK FILLING OF MATERIALS IN
 HOLY GARDENS OTON AS OF MARCH 15, 2013


Nakaabot na sa retaining wall ang tambak sa lawn 5




Nasa halos kalahati pa lang nang lawn 5 ang natambakan



Trak na nagtatambak sa lawn 5






kuha mula sa gilid ng retaining wall sa lawn 5


Kuha pag nakaharap sa lawn 4

Binigyan ng intruksyon ang driver ng filling