Showing posts with label Chapel Accomplishment. Show all posts
Showing posts with label Chapel Accomplishment. Show all posts

December 20, 2013

HGLUMP Chapel Accomplishment

BE a BIDDA: "BELIEVE, INSPIRE, DREAM, DO ACHIEVE"


 Laid tiles at main chapel and altar-100% accomplished


Floor tiles-main chapel


Floor tiles-altar


Main chapel floor tiles



On-going construction of liner



Pebbles washed-out along pathway in front of chapel


Accomplished liner in front of chapel



Laid tiles along pathway in front of chapel with liner


Laid tiles at porch area in front of office with liner



Laid tiles at Chapel A

 
Laid tiles at casket display


Perspective view of HGLUMP Chapel


December 16, 2013

HGLUMP Chapel Accomplishment as of December 14, 2013

"Pag gusto, may paraan; pag ayaw, maraming dahilan " BIDDA: " believe, inspire, dream, do, achieve"


Installed panel door at Chapel A with complete laid tiles with grout


Family Room of Chapel A with installed PVC door for toilet


Floor tiles at Chapel A with grout and border


Installed water closet for female toilet without PVC divider
(PVC divider to be installed January 2014)


Concreted pathway to male and female toilets


Installed lavatory for male and female toilet.
Granite and mirror to be installed on  January 2014.


Laid tiles for altar of main chapel


Floor tiles of main chapel


Form works for pebbles wash-out/ liner for pathway


Moldings for columns of chapel 



Installed downspout