Showing posts with label Nov. 1 preparations. Show all posts
Showing posts with label Nov. 1 preparations. Show all posts

October 25, 2014

Week 43: HGPMP Kaizen Reports

 BE a BIDDA: "BELIEVE, INSPIRE, DREAM, DO ACHIEVE"

Special project - recycling old tires


Placed at the unfinished manholes at right wing parking




Mga gagamitin sa pagcha- change oil
Pagchachange oil ng sasakyan - TLC and Crosswind

Pagtatanggal ng pintura ng zebra signs


Pagtatanggal ng mga pintura ng zebra signs

Repainting of zebra signs

Repainting of La Pieta Sculpture

Repainting of gutter at the entrance
Pinatahing flaglets ready for installation

 Flaglets at left wing


Flaglets at right wing



Flaglets at the entrance/topiary