Showing posts with label lessons learned. Show all posts
Showing posts with label lessons learned. Show all posts

November 04, 2011

Construction Meeting November 3, 2011

Constant & close communication. 5 disciplines: mental models, personal mastery, systemic thinking, shared vision, team learning. Are we close?Strictly acknowledge reading and understanding by promptly making a comment..comply.

NO: 03
Date: November 03, 2011
AGENDA:
Lightings and Electrical Planning
Watersupply of HGPMP
Watersupply of HGGMP
Drilling at HGLUMP
Next Years Pending - Toilets and Electrical All SBU
Present: Engr. Gilbert
HLUC / EVS
Sir JUS
ACTION POINTS
ITEM
DISCUSSION POINT
WHO
WHAT
WHEN
WHERE
Integrity of Reports
Truthfulness of Reports is questionable.
Reports submitted by Engr. Haylo is questionable with regards
to the quality, truthfulness and integrity since he is relying on
the daily reports submitted by the SBU's.
ie. Tall grasses at HGLUMP which was promised to be done at once
but upon site visit by JUS, actual pics of site is different from what is
reported.
Engr. Gilbert Haylo
All CMO
Accurate and Truthful Reports
Starting today
11/03/11
ALL SBU
Lighting and Electrical Planning
of All SBU
By next year, we will make sure that proper installation of lightings
to all SBU will be done, checked and monitored so as to avoid such
circumstances that happened this Nov.1, 2011 (ie. Electrical tripping,
HGPMP's 1 unit halide did'nt work, etc.)
Also, by next year, installation of metal halides and tappered lamp posts
will be implemented (correct loading - breaker and wires)
Engr. Gilbert Haylo
Honey Lou Castillo
Lighting and Electrical Planning of All SBU
ALL SBU
Water supply of HGPMP/ HGGMP
Request quotation from Engr. Pete Castillo for
main pipe design and elevated water tank with float valve
Engr. Gilbert Haylo
Honey Lou Castillo
Engr. Pete Castillo
Water supply of HGPMP/ HGGMP
11/05/11
HGGMP/ HGPMP
Drilling at HGLUMP
Arrange a meeting with N.U. Miguel and Engr. Pete Castillo
to discuss HGLUMP drilling - Cost, Process and Timeline
Engr. Gilbert Haylo
Honey Lou Castillo
Engr. Pete Castillo
Nehemias Ubias Miguel
Drilling at HGLUMPP
11/05/11
HGLUMP
Ashcrypt Roofing of HGLUMP
Engr. Haylo will request materials needed to start the construction
Engr. Gilbert Haylo
Ashcrypt Roofing of HGLUMP
11/04/11
HGLUMP
Filling Materials of HGPMP
Canvass filling materials asap, and provide the needed budget from operation
Brendalyn Garcia
Roshel F. Casillan
Engr. Gilbert Haylo
Filling Materials of HGPMP
11/04/11
HGPMP
Curb and Gutter of HGCMP
Engr. Haylo will send the estimated amount needed for construction
Engr. Gilbert Haylo
Honey Lou Castillo
Aireen Ricamara
HGCMP Curb and Gutter
11/04/11
HGCMP
Lessons Learned
1. Integrity of Reports
2. Integrity of Orders
3. Compliance
ALL
Things/ Lessons Learned
ALL SBU
Prepared by: PARTIES INVOLVED: Noted by:
HONEYLOU U. CASTILLO ENGR. GILBERT HAYLO EDITHA V. SAATO JORGE U. SAGUINSIN
Cc: JMTV/ BGG/ ASR/ AC

November 02, 2011

Lessons Learned last Nov.1, 2011

Constant & close communication. 5 disciplines: mental models, personal mastery, systemic thinking, shared vision, team learning.

I am sure a lot of lessons were learned as we executed the Nov. l, 20ll celebration. What were they?

TO : ES, ASR, GH, HLC

Do we remember them well? Can we execute them as we go along?

Next year, shall do them automatically without being told?

l. Visit to La Union Pangasinan and Calapan re tall grasses?

2. Tripping of breaker at HAMP, non lighting of a circuit in Pangasinan? Our inability to monitor electrical load of concessionaires.

3. Poor attitudes of some of the sites visited: no uniform, no ID, late

4. Our sales and collection performance last Nov. l

5. Our food preparation: multiplication of the loaves of bread.

6. Our limited budget.

7. Lack of understanding of VMBP, MVP our inability to link to FOFF, ME, and or sales talk.

Please comment ASAP comprehensively. Put time into this lesson learned. Part of Beliefs

Are we close? Strictly acknowledge reading and understanding by promptly making a comment..comply.

July 25, 2011

LESSONS LEARNED

There are plenty of lessons learned from the HGGMP misadventure with  Dhonest people"

l.  Subject all staff to a thorough BI.  Do not presume everyone to be innocent until proven otherwise.

2.  The reference letters must be a surety.  For sensitive position, ask for a formal surety agreement./

3   Train everyone and assess after training especially on MC l to 9. 

4.  Monitor very closely newly hired.  At first sign of non conformance or run away management:

     late reports
     not answering phones
     excessive expenses

    visit the site, issue corrective memos, discipline the erring individual

5.  It is better to overcontrol and be strict and then be compassionate, not the other way around

EXPERIENCES, ESPECIALLY THE BAD ONES ARE GREAT TEACHERS


--
Jorge U. Saguinsin
3f Fuentes Building, Angono Rizal
+632-65l420l
BPI - Helping in the Grief of Many People
Pls read blogs by clicking:holygardensgriefsharing.blogspot.com

                                      griefshare.wordpress.com

                                      holygardensgroup.blogspot.com