Always be Explaining:
Sale - Cost = GP
The goal of every business is to increase sales and reduce cost
Background:
All our staff, including our suppliers and contractors must be given sufficient explanation regarding events in the memorial park
1. Before when we were asked by Greenhills Development Corporation on what we can be done regarding the ravine and steep portion, the answer/opinion of the technical staff (engineers and architect) was that it was not feasible since it would entail huge expenses for backfilling, cut and fill operations (the traditional way)
2. When I introduced Cynthia Cartago to Mr. Henry Tanedo, the topic of the development of the 2nd half, the ravine of HGGMP came up and Ms. Cartago promised she will research
3 Using her own funds and former network, Ms Cartago came up with several drawings, which included suggestion on lower cost BC. Mras Cartago acted on suggestion/imploration of Mr Tanedo and she did not act on her own (although we encouraged Kaizen
4. The preliminary plans have been presented to Mr. Tanedo. He is waiting for final plans and project timeline.
5. The BC portion is now at standstill; MLII offer is at 7t/BC, there is an existing offer for only P5t with concrete panels for cover bolted.
At the current price, our computation shows an margin of only 12% for the BC + FSO + CUO. which is very low. Construction must be doing 30 to 40%. It is time to restudy the for Every Juan BC option
You must make every one at Holy Gardens understand this very well, virally
Jorge US
Holy Gardens Group
CONFIDENTIALITY NOTICE/disclaimer: The information contained herein is strictly confidential in nature and is the property of Holy Gardens Group and intended only for the intended recipient and its retransmittal , reuse,reprinting or taking action other than the intended party is strictly prohibited. Holy Gardens assume no responsibility liability arising from such unauthorized use.