Showing posts with label negligence. Show all posts
Showing posts with label negligence. Show all posts

December 27, 2018

Regrets on the PROPOSED PROMOTION OF GARDEN TECHNICIANS

With deep regrets to GT of Pangasinan, La Union and HAMP for non submission or kulang ng pagtutok

On Thu, Dec 27, 2018 at 10:00 AM Bpi Records <bpi.records3ffb@gmail.com> wrote:
To: HAMP
      HGLUMP
      OTON
      HGPMP
     

Good Day!

        As per Sir JUS post in the blog and email last September 29, 2018. He's giving the opportunity to the Garden Technician to be promoted by submitting the required outputs. Only Oton GT send their requirements, Samson Granada and Joemel Felosopo. 


Thank you.



On Sat, Sep 29, 2018, 12:39 PM Jorge Saguinsin <holygardens.groupnew@gmail.com> wrote:
TO        :    Holy Gardens Oton
                  Holy Gardens La Union
                  Holy Angels Memorial Park

Subject:    Proposed Promotion of Garden Technicians upon completion of certain requirements
                 (Up to two ranks)

                 Oton:      Samson Granada
                                Joemel Filosofo

                HAMP:     Gerald Apacionado
                                 Roberto Bolante
                                 Temecs Lllanza

                La Union:   Jojo Damondon
                                   Amado 

Objectives

               1.  To up the ranks of Garden Technician which was neglected  by past HR (the CMO should do more HR work
                     rather than HR who cant connect to the business nor to the staff)
               2.  To encourage the Garden Technicians to adopt changes and improve
               3.   To recognize the tenure of service of many Garden Technician

Reality:   

      1.  The following Garden Technicians have been with the us for the past several years and their
            ranks have been unchanged:

           1.  HAMP                                           Date Hired           Rank                   Length of Service

               1. Gerald Apacionado                     April  2001           R1                             17 years
               2.  Roberto  Bolante                       January 2006       R1                             12 years
               3.  Tomecs Llanza                          June 2003            R1                             13 years

           2.  HG Oton

                 4   Joemel Filosofo                             January 2016       R1                               2 years
                 5.  Samson Granada                          Sept 20, 2004      R3                               14 years

            3.  Hg La Union

                 6.  Jojo Damondon                             May 13, 2011       R1                             7 years (no 201 file subject to submission of reqts)
                 7.   Amado Espenilla                          Feb 18, 2002        R1                            16 years
                 8.  Arnold Jucar                                  January 17, 2016  R1                            2 years

            4.  HG Pangasinan

                 8.  Juanito Alcantara                          Aug 13, 2009       R1                             9 years
                 9.  Alberto Gutierrez                           Sept 24, 2012      R1                             6 years

                *Claimed date of employment and salary rank are subject to verification

What to do next:    

      1.  By December give at least P1k cash gift for every year of service this Christmas to all those mentioned here.

      2.  One rank promotion if the incumbent complies with all the following requirements:
        


           1.  Two pages handwritten summary or 10 pp summary of admin plan  (ppt enclosed)  PLEASE UNDERSTAND ABE WELL

           2.  5 pages summary of landscaping basics including global warming  (landscaping basics)    PLEASE ABE WELL

           3.  resumption of nursery:  garden and grasses

           4. Adoption of 60% of the innovation mentioned in the GT conference
                   1.  Street sweeper caddy
                   2.  Tongs
                   3.  Vertical gardens

          Bonus promotion:    one additinal  rank higher if the GT can do any three of the following repairs:
          (to be examined by Engineer GCH)

                   1.  Sanitary:   Leaks of pipes faucets, valves

                   2.  Electrical:   Tracing short, resetting circuit breaker

                   3. Masonry:   palitada, setting up rebars etc

                   4.  Carpentry:  repairs of chairs tables, cabinets

Timeline:    October 1 to December 20, 2018 submission of requirements
                   December 26, 2018  approval of promotion
                   Award of longevity awards   Christmas party
                   Increase of salary by January 1, 2019

Other conditionalities:  

1.   Laging naka uniporme at ID
2.   Walang late at absent
3.   Nagsusubmit ng hinihingi ng CMO na report
4.   Nasusunod ang standard sa kalat at pangunguto ng damo
                  

           

--

           Glizel Ann R. Mesa
      Record Assistant

With GOD All things are POSSIBLE! 
                        Mark 10:27


--
PAGSASANAY SA TAGUMPAY (Training for Success)



























  Jorge U. Saguinsin

YOUR OFFICES ARE TO REFER TO THESE ON QUESTION ABOUT PRODUCTS information and pricing.  Please RRURAC

Holy Gardens One Stop Shop (Master Brochure)








1.  LET US WORK TOGETHER TO CREATE BEAUTIFUL LIFE STORIES (not worries)

2.  BIDDA:     BELIEVE, INSPIRE, DREAM, DO AND ACT

3.  Read and answer all email and texts.  Be responsible

 4   RRURAC   (Read, Reflect, Understand, Realize Act, Check)  # 3

5. Makipag TIPAN -  iGALANG ang mga nasusulat:  CCD handbook at MC

Pag uusapan sa am talk

 YOUR OFFICES ARE OBLIGED ORDERED TO UPDATE  THEIR POSTS AT THE FOLLOWING SITES: (they have been placed here for your easy reference)

   




   Weekly posting  at HolyGardens Communications and Best Pictures













Notice:   This email address is a private property of Holy Gardens Group and its contents are private and confidential.    Its contents and attachment  may not be copied nor forwarded to parties other than the ones intended to,  nor can the contents be used other than the original intent  You are advised to delete the message you received if in case it may have been wrongly sent to your good office

April 05, 2018

Reward the Doers Punish the Non Performers Violators

Punishment.   Reward the doers and punish the offenders:

1.  Let us document the offenses of  SFC of an SBU who failed to submit abstracts of   since November.  This is a  Class D offense.  Let us establish and document this offense.  Tatanggap ba sila ng incentive even if there are violations

2.  Call the attention of CSS trainee of the same SBU  in writing regarding:

    1. Being absent, neglecting his work ie not attending to interment today.  Kung may sakit, kumuha ng med certificate.   NEGLIGENCE AND INSUBORDINATION

    2.  Was given an order to report on sales and collection achievement for 1st quarter and to submit this today.   INSUBORDINATION

        For all intents and purposes, this was not done and not followed and is insubordination.

For compliance, execution

On Thu, Apr 5, 2018 at 4:14 PM, Jorge Saguinsin <holygardens.groupnew@gmail.com> wrote:
  Madel Alyzha

1.  75% achievement natin pero marami pa rin P10 million.  Mahihilot natin yon this quarter

2.  Be inspired.

3.  Fight

4. Collect and collect. Follow up

to your good office

March 19, 2016

Lessons from RCBC involvement in Bangladesh heist and money laundering

BE a BIDDA: "BELIEVE, INSPIRE, DREAM, DO ACHIEVE"

Rizal Philippines
March 19, 2016

He said, she said: who is telling the truth at the RCBC laundering case?

One of the lessons of history is that people dont learn their lessons from history.  They are ignored and viewed as one of the events passing through time.  A self aware individual learns from mistakes and misdeeds of history.

Lessons

1.  Small mistake big consequences.  The involvement of the Philippine financial system and the ease by which the money laundering took place places the remittance business, the Philippine economy, and the OFW beneficiary in jeopardy.  When the remittance centers accounts abroad are closed on suspicious that the remittances (as one of the remittance centers allegedly owned by one of the RCBC depositors) then it becomes more difficult to have foreign currency inaward remittances. It will wreck havoc on the reserve and dollar position of the country.

Action:   Do it right the first time.  Avoid reworks and recycling operations

2.  Disobedience and insubordination - The RCBC branch manager at Jupiter proceeded to have the withdrawal processed despite a stopped payment received at 9:00 am.   Disregard for communications and orders which is widespread in the company now, can lead to a disaster like this.  Most likely, RCBC will have to pay the $81 million which it allowed to be withdrawn despite a stop payment order.

There are sbus who have their own "akala ko" or change in job descriptions according to their thoughts and initiative  .

Action:  Let us read and follow orders. Follow one of the 3fold duties of an employee.  Obedience.  
Read blogs, read memos, read manuals. " Sundin ang" job descriptions and process. "Sundin ang utos."