July 05, 2012

Water System in Pangasinan and La Union

TO            :   HLC, ASR,

CC           :  GCH, LDA,  BG

Re           :  Minutes of the Meeting with Engr. Pete Castillo on Panga and LUMP water system;

A.  Pangasinan:

l.  The depth of the perforation should be at 80 ft;  NUM must speed up the repairs and be hands on. The 2 hp motor is ok.
2.  The substitute in the meantime shall be:

         l.  The ponding system with a  pump on floater (aprox cost P120,000.) 5 hp pump

         2.  The main line shall be computed by PC;  payable in terms over a period of one year. He will submit after 2 weeks.

         3.  Should the pump work, it shall be merely used to fill up the pond during summer, the line to be used
shall be main line using valves to redirect the water. flow.

3.  For the chapel and toilet:

        l.  Two elevated water shalll be put up:  one for clean domestic use from the water district, and the other one for grey water coming from the well, for toilet flushing

B.  La Union

l.  The open well shall be rehabilitated.  A pump shall be bought to drive water up to the storage tank

2.  In the available space for the lagoon:

    an Small Impounding Pond shall be dug which shall:

    l.  collect run off water from the mountains

    2.  prevent water build up which destroys the rip rap;

    3.  storage of rain water;

3.  The water shall be pumped up a storage elevated tank near the chapel.  It shall be concrete 3 x 3 meters x 10 meters located at highest point of the park;

      l.  It shall have overflow outlet, and excess water shall be made to run off the drainage system to the highway;

     2.  the irrigation shall be gravity only

4.  Should there be no available space, the land adjoining the property, about 50 sm can be bought for the water tank.
.
     There would be no more drilling contract with NUM

WTDN:

l.  NUM must submit  necessary documents to turn over the well (not working as of now) including the drilling log and NWRB permit

2.  Notice that the NUM contract in LUMP is deemed terminated on account of the difficulties with the Panga project.

Kindly update this minutes if I missed anything

JUS

No comments:

Post a Comment

1. One of our beliefs is learning. It pays that you learn more to do more Just to survive you have to learn how forage in a forest or raise your food, catch prey

2. In order to discharge your job well, you have to learn your admin plan the process flow and standards.

3. To keep up with changes, you have to learn and read. There is no other way

4. signify that you have read by putting your name on this comment box. Every staff must: post the name on this comment box, or like, agree/will do. Your registering on this comment box is being graded under communication. Observe RRURAC: Read, Reflect, Understand, Realize (apply to reality) Apply, and Check (if it works)
You need to make __comments a month to qualify for promotion under our CCD

Read the posts on this site every AM talk. Many problems arise simply because people do not know what to do, because they did not read this site

We are making sure that you improve yourself, engage yourself in self improvement through this site...






Note: Only a member of this blog may post a comment.