Showing posts with label BACK FILLING OF MATERIALS. Show all posts
Showing posts with label BACK FILLING OF MATERIALS. Show all posts

February 02, 2013

HOLY GARDENS OTON BACK FILLING OF MATERIALS AS OF FEBRUARY 2, 2013

Let us have ears that can hear, minds that can understand, hearts that can feel, hands that can do...Let us read and understand these posts.

HOLY GARDENS OTON BACK FILLING OF MATERIALS 
AS OF FEBRUARY 2, 2013

Layered RC Pipes in between Lawn 4 (left side) and Lawn 5 (right side)



 Filling Materials in Lawn 5 Area


Filling Materials awaiting to be scrape in Lawn 4 area facing Entrance
and Lawn 3 


Filling Materials awaiting to be scrape in Lawn 4


Delivery trucks leaving the Filling area




Delivery Trucks dumping filling materials in Lawn 5 area