August 14, 2011

What are Long Term Solutions to the Landslide at La Union

Constant & close communication, discipline are the keys to unity, shared learning, vision and success.

TO      :  MGB, GH, JV

FROM :  JUS
SUBJECT:  Long Term Solutions to the Landslide Problem at HGLUMP


l.  What is the timeline for the reconstruction of the the fallen mausoleum of the Martinez family.  When are you submitting this?   Where do we get the money?

2.  What are the other things that we must do so that it will not repeat itself?  Think that only huge amount of water from the mountains can cause this landslide?

Please answer under comments

JUS

What are your analyses?  What are the options?  What shall we do.



Strictly acknowledge reading and understanding at comments ALL THE TIME Please constantly comply..

3 comments:

  1. Below is the timeline for the reconstruction of mausoleum of the Martinez family


    Scope of works Timeline


    Clearing works Aug 18-25,2011

    Demolition of collapsed mausoleum Aug 22 –Sept 3, 2011

    Excavation of Riprap- Sept 4- 10,2011

    Rabarworks- Sept 10-13, 2011

    Laying of boulders and grouting- Sept 14- Oct 10,2011

    Concreting of column and the beam- Sept 30-Oct 10,2011

    Concreting of column and tie beam- Sept 20-Oct 10,2011

    CHB laying for fence Oct 5-8,2011

    Concreting of column Oct 9-10,2011

    Backfilling of Mausoleo area- Oct 11,2011

    Before we can proceed to the clearing we need to secure approval from the owner of Manukan (Ex Brgy Captain Gonzales) the letter was already done but according to the meeting conducted today (August 16,2011) we need to pay first all the damages before we can proceed. Minutes of the meeting will be email by Ms Jobyl today.

    Since the approval delayed by Ex Kapitan for so many demand he is asking I am recommending to look for a possible location with same type of lot of Martinez Mausoleum and transfer their location so that we can proceed to the construction of Mausoleum. We will get the approval from the Martinez family and JV partner.

    Things we can do so that it will not repeat the same.

    1. Fabrication of drainage going to Lagoon
    2. Lagoon going to main chapel through cistern
    3. Cistern going to main road

    ReplyDelete
  2. 1. The time line for the reconstruction of the fallen mausoleum of Martinez family is 1 1/2 months I already submitted a recommendation to transfer the structure to other location for us to reconstruct it in an earlier time & finished it before November 1.


    2. If there is a rain, i will observe if the rainwater from the mountain still came in to our memorial park, then i will trace the location where they pass & i will close it through concreting or plastering.


    3. Since we have no outfall for our drainage, we need to construct the lagoon and through the use of pump motor, we will transport rainwater//sewage into cistern that will serve as a reservoir and we can use it in watering plants during summer season, and we can also transport it to main drainage of national road through pump motor.

    Engr. Gilbert Haylo

    ReplyDelete
  3. RESULT OF THE MEETING:
    As per conversation with Mr. Glorioso Gonzalez the following are the conditions before we can proceed on clearing and construction at the collapsed area near th Gonzales farm:
    1. Decline to received the letter. He wants us to Settle and pay first the damages which includes the following:
    a. 10 fighting cocks (3 inahin, 7 tandang)
    b.carabao grass
    c. fishnet, polynet, round plastic chicken feeder and other materials for the cocks.
    d. 3 1/2 cubic sand, tambak, rivermix owned by Lorna Aguda
    e. 2 batya, palanggana stainless, 3 balde, tambak and 3 cubic buhangin owned by a certain Luz Delos Reyes.
    f. 3 cubic buhangin and river mix owned by Lynn Porteria

    2. He also stops the ongoing roadworks at GE and FE area because according to him the said work has no permit from the barangay.

    If we have already settled the said conditions ,only then the clearing and construction shall proceed.

    As of now i am working with the permit of roadworks at GE and JE area. Amd we are having meeting with Engr. Haylo on how we can solve the problem of Martinez mausoleum because we are now running of time. November 1 is fast approaching and the Martinez family is expecting that their mausoleum will be done before the said date.

    As per result of eeting with Ma'am Lanie and Engr. Haylo we have come up with the following recommendation:
    1. To settle the problem with Martinez family we recommend that the location will be transferred to other location. We will get approval from the family. Also the approval of our joint venture.


    And these are the possible solutions that we could do in order to prevent this kind of situation again.
    1. Fabrication of drainage going to La Union
    2. Lagoon going to main chapel
    3. Cistern going to main road


    Jobyl Marie T. Villanueva
    HGLUMP

    ReplyDelete

1. One of our beliefs is learning. It pays that you learn more to do more Just to survive you have to learn how forage in a forest or raise your food, catch prey

2. In order to discharge your job well, you have to learn your admin plan the process flow and standards.

3. To keep up with changes, you have to learn and read. There is no other way

4. signify that you have read by putting your name on this comment box. Every staff must: post the name on this comment box, or like, agree/will do. Your registering on this comment box is being graded under communication. Observe RRURAC: Read, Reflect, Understand, Realize (apply to reality) Apply, and Check (if it works)
You need to make __comments a month to qualify for promotion under our CCD

Read the posts on this site every AM talk. Many problems arise simply because people do not know what to do, because they did not read this site

We are making sure that you improve yourself, engage yourself in self improvement through this site...






Note: Only a member of this blog may post a comment.